Use cases

IXL Simulation

Explore how simulation enables testing of railway interlocking interfaces before commissioning, while the live railway continues to operate.

IXL Simulation. Any scenario, every possibility.

The IXL Simulator reproduces legacy interlocking interfaces for testing in the lab or on site against systems such as ERTMS Level 2. In this example, an independent simulation layer supports testing of the new system while the live railway continues to operate under legacy signalling, allowing testing before commissioning without track possession.

Live traffic & legacy signals

Train → Occupied section Allocated ahead Signal update →
Both sides of the live railway operate on legacy signalling.
For illustration only. This is not an actual railway layout or signalling configuration. Testing without track possession precedes commissioning with real trains.

Full-stack ERTMS Level 2 testing without track possession

While ordinary traffic continues under legacy signalling, the IXL Simulator reproduces the interlocking signals for the test train and feeds them into ERTMS Level 2 across the transition zone. This allows the train to test the full Level 2 system as though the test section had already been upgraded. Legacy safety remains active throughout, and normal services continue without track possession.

1 · Waiting in the shunting area

The test train waits off the main line while ordinary traffic continues.
For illustration only. This is not an actual railway layout or signalling configuration. Legacy safety remains active throughout.